A general contractor hired AK Industrial Services to remove mill scale from new pipe spools before installation. The AK Team used 40,000 psi water with a remote hose tractor to safely complete the work.
The general contractor wanted to mill scale removal done before they installed the pipes. They transported the pipe spool to and from the AKIS yard for in-house hydrolasing. This made the process even more efficient for the AK team.