Bridge No. B-29-003 Route 112 over Route 2 – Buckland, MA

AK Industrial Services was contracted to perform hydro-demolition to scarify the bridge deck removing .5” of concrete in order to provide a substrate suitable for placing polymer modified concrete.

AK utilized its ultra-high-pressure demolition equipment to remove the concrete and provide a roughened surface for placement of the polymer modified concrete.

Request A Quote Today!

  • Member

  • Contact

      AK Industrial Services, LLC

    • 617.884.9252
    • info@akservices.com
    • 347 Third Street
    • Everett, MA 02149
  • © 2019 AK Industrial Services LLC. All Rights Reserved. | Website developed by Siphon Marketing