Cowanesque Dam Spillway Rehab

AK Industrial Services performed hydrodemolition on the Cowanesque Dam Spillway in Lawrenceville, PA. Using an AquaJet 710v robot and a Hammelman 803 high-pressure pump, the AKIS team was able to remove an average depth of 3.5″ of deteriorating concrete to a height of 25′ on the spillway walls. The AKIS team also used an EcoClear to filter and treat the water for disposal.

  • Location: Lawrenceville, PA
  • Owner: New Dominion Construction
  • Client: R&W Concrete
  • Services:
  • Markets:
  • Images: Gallery

Request A Quote Today!

Markets Served

  • Buildings
  • Civil & Infrastructure
  • Industrial
  • Marine
  • Power
  • Member

    • Contact

        AK Industrial Services LLC

      • 617.884.9252
      • info@akservices.com
      • 347 Third Street
      • Everett, MA 02149
    • © 2025 AK Industrial Services LLC. All Rights Reserved. | Website developed by Siphon Marketing