AA Will – TD Garden

The contractor had some newly installed drainage pipes that were clogged with new concrete.  After attempting the removal with other methods, the contractor called AK Industrial Services.

AK utilized its ultra-high pressure pumps with different hydro-lasing tools to blast out the concrete and clean the interior of the pipes.

Request A Quote Today!

Markets Served

  • Buildings
  • Civil & Infrastructure
  • Industrial
  • Marine
  • Power
  • Member

    • Contact

        AK Industrial Services LLC

      • 617.884.9252
      • info@akservices.com
      • 347 Third Street
      • Everett, MA 02149
    • © 2024 AK Industrial Services LLC. All Rights Reserved. | Website developed by Siphon Marketing