Cummington, MA over the Westfield Brook

AK Services performed robotic partial depth hydro-demolition removal of 6” of concrete from bridge deck over the Westfield brook in Cummington, MA.

Key Challenge: Water control and diversion: completing hydro-demolition while not allowing water to enter into the Westfield Brook

Services Performed: Partial depth removal while not damaging existing steel reinforcement

Patchwork: MassDOT inspected the bridge prior to the start of hydro-demolition and marked out areas for full-depth removal.

Ultra-high pressure, 36,000-psi at 12-gpm

Request A Quote Today!

  • Member

  • Contact

      AK Industrial Services, LLC

    • 617.884.9252
    • info@akservices.com
    • 347 Third Street
    • Everett, MA 02149
  • © 2023 AK Industrial Services LLC. All Rights Reserved. | Website developed by Siphon Marketing