Cummington, MA over the Westfield Brook

AK Industrial Services performed robotic partial depth hydro-demolition removal of 6” of concrete from the bridge deck over the Westfield brook in Cummington, MA.

Key Challenge: Water control and diversion: Completing hydro-demolition while not allowing water to enter into the Westfield Brook.

Services Performed: Partial depth removal while not damaging existing steel reinforcement.

Patchwork: MassDOT inspected the bridge prior to the start of hydro-demolition and marked out areas for full-depth removal.

Ultra-high pressure, 36,000-psi at 12-gpm

Request A Quote Today!

Markets Served

  • Buildings
  • Civil & Infrastructure
  • Industrial
  • Marine
  • Power
  • Member

    • Contact

        AK Industrial Services LLC

      • 617.884.9252
      • info@akservices.com
      • 347 Third Street
      • Everett, MA 02149
    • © 2024 AK Industrial Services LLC. All Rights Reserved. | Website developed by Siphon Marketing