AK Industrial Services, LLC performed hydrodemolition at the MBTA’s Reservoir Station in Brookline, MA. Using an Aquajet 710 Robot, the crew removed 400 SF of concrete to a depth of 8″. AKIS removed a 225′ x 21′ strip on the northern side of the platform, which exposed the rebar ties for the new concrete.