AK Industrial Services, LLC performed membrane removal at the Fairhaven Wastewater Treatment Plant. Using hand lances and 10,000 psi high pressure water, AKIS crews hydroblasted the existing concrete clarifier tanks to clean the interior surfaces and remove the parge coating.